STROBOSCOPE Publications

The following publications are available in Adobe Acrobat (pdf) format and can be downloaded or viewed on-line. Click on a title to see more details including a short abstract.

Ph.D. Dissertation

Martinez, J. C., "STROBOSCOPE: State and Resource Based Simulation of Construction Processes," Ph.D. Dissertation, University of Michigan, Ann Arbor, Michigan, 1996.

Articles

Ioannou, P.G., Martinez, J.C., "Who Serves Whom?- Dynamic Resource Matching In An Activity-Scanning Simulation System," Proceedings, Winter Simulation Conference 99, Phoenix, Arizona, December 5-8, 1999

Ioannou, P.G., "Construction of a Dam Embankment With Nonstationary Queues,"Proceedings, Winter Simulation Conference 99, Phoenix, Arizona, Dec. 5-8, 1999

Martinez, J.C. and P.G. Ioannou. "General Purpose Systems For Effective Construction Simulation," Journal of Construction Engineering and Management, American Society of Civil Engineers, (125)4, July-August 1999.

Ioannou, P.G., Martinez, J.C., "Project Scheduling Using State-based Probabilistic Decision Networks" Proceedings, Winter Simulation Conference 98, 1287-1295, Washington, D.C., December 13-16, 1998

Martinez, J.C., Ioannou P.G., "State-Based Probabilistic Scheduling Using Stroboscope's CPM Add-On," Proceedings, Construction Congress V, 438-445, Minneapolis, MN, Oct 4-8, 1997.

Ioannou, P.G., Martinez, J.C., "Simulation of Complex Construction Processes,"Proceedings, 1996 Winter Simulation Conference, 1321-1328, Coronado, CA, December 8-11, 1996.

Ioannou, P.G., Martinez, J.C., "Scaleable Simulation Models for Construction Operations," Proceedings, 1996 Winter Simulation Conference, 1329-1336, Coronado, CA, December 8-11, 1996.

Ioannou, P.G., J.C. Martinez, "Comparison of Construction Alternatives Using Matched Simulation Experiments," Journal of Construction Engineering and Management, ASCE, Vol. 122, No. 3, 231-241, September 1996.

Ioannou, P.G., Martinez, J.C., "Animation of Complex Construction Simulation Models," Proceedings, 3rd Congress on Computing in Civil Engineering, 620-626, ASCE, Anaheim, CA, June 17-19, 1996.

Martinez, J.C., P.G. Ioannou, "Advantages of the Activity Scanning Approach in Modeling Complex Construction Processes," Proceedings, 1995 Winter Simulation Conference, 1024-1031, Washington, DC, December, 1995.

Ioannou P.G., Martinez, J.C., "Evaluation of Construction Alternatives Using Simulation," Construction Congress 95, ASCE, 440-447, San Diego, CA, October 22-26, 1995.

Martinez, J.C., Ioannou, P.G., "General Purpose Simulation with Stroboscope,"Proceedings, 1994 Winter Simulation Conference, 1159-1166, Orlando, FL, December 11-14, 1994.

Martinez, J.C., Ioannou, P.G., Carr R.I., "State- and Resource-Based Construction Process Simulation," Proceedings, ASCE First Congress on Computing in Civil Engineering, 177-184, Washington, DC, June 20-22, 1994.

Stroboscope, EZStrobe, ProbSched, Vitascope and Vitascope++ are based upon work supported by the National Science Foundation under Grants No. 9733267, No. 0113890, and No. 0732560. Any opinions, findings, and conclusions or recommendations are those of the author(s) and do not necessarily reflect the views of the National Science Foundation.